&nbsp
International Customer Service
Phone +49 30 2601-2759
Fax +49 30 2601-1263

Standard [WITHDRAWN] 2011-04

DIN EN 61347-2-3 Berichtigung 1:2011-04;VDE 0712-33 Berichtigung 1:2011-04

VDE 0712-33 Berichtigung 1:2011-04

Lamp controlgear - Part 2-3: Particular requirements for a.c. supplied electronic ballasts for fluorescent lamps (IEC 61347-2-3:2000 + A1:2004 + A2:2006); German version EN 61347-2-3:2001 + Corrigendum July 2003 + A1:2004 + A2:2006, Corrigendum to DIN EN 61347-2-3 (VDE 0712-33):2006-08; German version CENELEC-Cor. :2010 to EN 61347-2-3:2001

German title
Geräte für Lampen - Teil 2-3: Besondere Anforderungen an wechselstromversorgte elektronische Vorschaltgeräte für Leuchtstofflampen (IEC 61347-2-3:2000 + A1:2004 + A2:2006); Deutsche Fassung EN 61347-2-3:2001 + Corrigendum Juli 2003 + A1:2004 + A2:2006, Berichtigung zu DIN EN 61347-2-3 (VDE 0712-33):2006-08; Deutsche Fassung CENELEC-Cor. :2010 zu EN 61347-2-3:2001
Publication date
2011-04
Accessibility
Original language
German

Please select

Free of charge

Purchasing options

Shipment 1
  • Free of charge

1

 Attention: Document withdrawn!

Publication date
2011-04
Accessibility
Original language
German

Quick delivery via download or delivery service

Buy securely with a credit card or pay upon receipt of invoice 

All transactions are encrypted

Overview

Through Corrigendum 1 to DIN EN 61347-2-3 (VDE 0712-33):2006-08, the reference to EN 61347-1:2001 contained in the EN foreword has been changed into an undated reference. It is recommended to mark the respective standard with a reference to this corrigendum. The Subcommittee responsible for this Corrigendum 1 is UK 521.3 "Geräte für Lampen" ("Auxiliaries for lamps") of the DKE (German Commission for Electrical, Electronic and Information Technologies) at DIN and VDE.

Amendments

This document has been replaced by:: DIN EN 61347-2-3:2012-05;VDE 0712-33:2012-05 .

Loading recommended items...
Loading recommended items...
Loading recommended items...
Loading recommended items...