&nbsp
International Customer Service
Phone +49 30 2601-2759
Fax +49 30 2601-1263

Technical rule [WITHDRAWN]

VDI/VDE 3695 Blatt 2:2010-11

Engineering of industrial plants - Evaluation and optimization - Subject processes

German title
Engineering von Anlagen - Evaluieren und optimieren des Engineerings - Themenfeld Prozesse
Publication date
2010-11
Original language
German, English
Pages
36

Please select

from 92.90 EUR VAT included

from 86.82 EUR VAT excluded

Purchasing options

PDF download 1
  • 92.90 EUR

Shipment (3-5 working days) 1
  • 103.30 EUR

1

 Attention: Document withdrawn!

Publication date
2010-11
Original language
German, English
Pages
36

Quick delivery via download or delivery service

Buy securely with a credit card or pay upon receipt of invoice 

All transactions are encrypted

Short description
The guideline can be applied to engineering organizations (EO) which plan, create and/or commission automated machines or plants. It is intended to support EOs in assessing their own current situation and to give advice for them which target status under the given constraints and conditions are desired. It is shown how the desired target status as well as costs, risks and chances are related and closely connected to the adoption of the procedure. This part of the guideline focuses on the processes that are part of the workflow in an EO. The procedure model for project activities, the procedure model for project-independent activities, etc. is described.
Content
ICS
35.240.50
Replacement amendments

This document has been replaced by:: VDI/VDE 3695 Blatt 2:2021-06 .

Also available in
Loading recommended items...
Loading recommended items...
Loading recommended items...
Loading recommended items...